1101 S University
1101 S University - Approved
Multi story addition to the Espresso Royale building at the corner of S and E University. The new floors would consist of three large residential units. This building is surrounded on two sides by the Vic Village North development. No updates in over a year as of mid 2019.
Floors: 5
Height: 64 feet
Residential Units: 3
Bedrooms: 16
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/new_apartments_above_ann_arbor.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/3-story_building_addition_on_s.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/vertical_expansion_of_espresso.html
1140 Broadway St
1140 Broadway St - Under Construction
Three buildings with 620 housing units and 4635 sqft of ground floor retail space in Lower Town. 549 apartments with 676 bedrooms and 71 condos with 138 bedrooms. The condo development will have the name NINE99. The apartments will be called Broadway 1200. In July 2019 the condo project was put on hold. The two apartment buildings are still moving forward.
Construction Start: Fall 2018
Construction Finish: 2020
Floors: 7
Height: 83 feet
Parking Spaces: 579
Cost: $146M
Total Square Feet: 826081
Residential Units: 617
Retail Square Feet: 4500
https://www.mlive.com/news/ann-arbor/2019/07/ann-arbor-residents-suing-city-over-lower-town-development.html
https://www.mlive.com/news/ann-arbor/2019/07/ann-arbor-condo-development-on-hold-due-to-slow-sales.html
http://nine99annarbor.com/
https://nine99annarbor.com/2094-2/
https://treedowntown.com/2017/11/19/1140-broadway-lowertown-development-time-to-push/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/12/146m_redevelopment_of_vacant_a.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/12/see_revised_plans_for_1140_bro.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/ann_arbor_gives_developer_2_we.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/10/146m_development_spurs_debate.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/city_council_postpones_final_v.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/residents_speak_out_about_rede.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/new_plan_for_146m_development.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/developer_seeks_tax_incentives.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/02/first_look_at_146m_redevelopme.html
https://localwiki.org/ann-arbor/1140_Broadway_Street
115 Research Dr
115 Research Dr - Approved
Two floor small office building off of North Main St. No updates on this project in over a year as of mid 2019.
Floors: 2
Height: 46 feet
Parking Spaces: 43
Total Square Feet: 14115
Office Square Feet: 14115
1215 S University
1215 S University - Stalled
4 story mixed office and retail building on South University. No updates on this project since late 2016.
Floors: 4
Height: 51 feet
Total Square Feet: 13330
http://www.mlive.com/news/ann-arbor/index.ssf/2016/07/4-story_restaurantoffice_build.html
132 Hill Street
132 Hill St - Under Construction
Small student targeted apartment building southwest of campus containing 5 units with 4 to 6 bedrooms. Similar to the recently completed development across the street. This project looks to be moving towards construction as of early 2019.
Construction Start: 2019
Floors: 3
Height: 30 feet
Parking Spaces: 8
Total Square Feet: 11653
Residential Units: 5
Bedrooms: 28
https://www.mlive.com/expo/news/erry-2018/11/4d93269bbf1766/ann-arbor-oks-28bed-student-ap.html
143 Hill Street
143 Hill St - Complete
4 unit rental building to the the southwest of central campus targeted towards students. 6 bedrooms and 3.5 bathrooms per unit - $5400 / month / unit.
Construction Start: Fall 2017
Construction Finish: Summer 2018
Floors: 3
Height: 30 feet
Parking Spaces: 7
Cost: $0.9M
Total Square Feet: 9028
Residential Units: 4
Bedrooms: 24
https://offcampushousing.umich.edu/property/view/listingid/428503?share=f906b9157c28269b29a741e14d2f1b78
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/ann_arbor_council_oks_new_deve.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/02/new_development_planned_where.html
http://www.annarbor.com/news/city-of-ann-arbor-may-soon-condemn-occupied-property-at-143-hill-street/
https://localwiki.org/ann-arbor/143_Hill_Street
1510 E Stadium
1510 E Stadium - Concept
Site proposed by the city council for affordable housing. This is currently the location of the fire prevention office, operating out of an old fire station. Selling this land ties into the fire department's plans to upgrade its facilities.
https://www.mlive.com/news/ann-arbor/2019/03/ann-arbor-exploring-new-options-for-affordable-housing-on-3-sites.html
2000 S Industrial
2000 S Industrial - Concept
Site proposed by the city council for affordable housing. This is currently the location of the Ann Arbor Housing Commission offices.
https://www.mlive.com/news/ann-arbor/2019/03/ann-arbor-exploring-new-options-for-affordable-housing-on-3-sites.html
2050 Commerce Blvd
2050 Commerce Dr - Approved
Apartment building aimed at working professionals on the far west side with 267 units. 29 studios, 170 one bedroom units, and 68 two bedroom units. No obvious progress towards construction as of early 2019.
Floors: 6
Height: 55 feet
Parking Spaces: 365
Cost: $44M
Total Square Feet: 327399
Residential Units: 267
Bedrooms: 335
https://www.loopnet.com/Listing/2050-Commerce-Dr-Ann-Arbor-MI/13566426/
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/44m_apartment_development_appr.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/267_apartments_proposed_on_ann.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/267_apartments_proposed_on_ann.html
208 W Ann
208 W Ann - Stalled
Small multi family apartment building in the northwest corner of downtown. As of October 2018 it looks like this project has been abandoned and instead the house is being renovated as two apartments.
Floors: 3
Height: 35 feet
Parking Spaces: 1
Total Square Feet: 13815
Residential Units: 12
Bedrooms: 36
212 S State St
212 S State - Proposed
Five floors of residential micro units above new bathrooms for the Michigan Theater. Located behind Sava's off of State St. Part of the larger 600 E Washington project immediately to the north.
Floors: 6
https://www.mlive.com/expo/news/erry-2018/12/54dd5ad3cd2925/19story-highrise-proposed-behi.html
2300 Traverwood Phase 3
2300 Traverwood - Complete
Office building addition for Google off the Plymouth Road corridor.
Construction Start: 2015
Construction Finish: 2016
Floors: 3
Height: 40 feet
Parking Spaces: 520
Total Square Feet: 68166
Office Square Feet: 68166
http://www.mlive.com/business/ann-arbor/index.ssf/2017/09/google_unveils_new_campus_in_a.html
2625 Jackson Ave
2625 Jackson Ave - Under Construction
New restaurant and retail building adjacent to Westgate. Construction moving forward as of early 2019.
Construction Start: 2019
Floors: 1
Height: 22 feet
Parking Spaces: 20
Total Square Feet: 5040
Retail Square Feet: 35000
2857 Packard
2857 Packard Rd - Stalled
51 home subdivision on the south east side of Ann Arbor. Project approval was denied by the city. The developer subsequently sued the city. A comprimise proposal, consisting of attached houses instead of detached ones in order to have less impact on the site, is coming back for consideration in 2019.
Parking Spaces: 102
Residential Units: 51
https://www.mlive.com/news/ann-arbor/2019/10/fate-of-trees-in-question-after-ann-arbor-rejects-subdivision-plan.html
https://www.mlive.com/news/ann-arbor/2019/02/ann-arbor-to-consider-new-subdivision-plan-from-developer-suing-city.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/speaking_for_the_trees_leaves.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/new_56-home_subdivision_propos.html
https://localwiki.org/ann-arbor/2857_Packard_Road
309 N Ashley
309 N Ashley - Approved
Mid sized condo building on the north side of downtown. Site rrep work underway as of mid 2019.
Floors: 5
Height: 59 feet
Parking Spaces: 36
Total Square Feet: 40500
Residential Units: 19
Bedrooms: 45
https://www.mlive.com/news/ann-arbor/2019/07/as-one-ann-arbor-condo-project-stalls-another-moves-forward.html
https://www.mlive.com/news/ann-arbor/2019/05/5-story-condo-development-in-downtown-ann-arbor-okd.html
https://www.mlive.com/news/ann-arbor/2019/04/environmental-cleanup-underway-as-new-marijuana-dispensary-plans-move-forward-in-ann-arbor.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/5-story_condo_building_propose_1.html
315 S Main St
315 S Main St - Complete
6 floor office building with ground floor retail on Main Street. This is the site of what was the Main Street M Den and other retail. M Den will be moving into the new building when it is complete.
Construction Start: Spring 2017
Construction Finish: Summer 2019
Floors: 6
Height: 92 feet
Parking Spaces: 4
Cost: $4.35M
Total Square Feet: 32813
Retail Square Feet: 4000
Office Square Feet: 26000
http://www.mlive.com/news/ann-arbor/index.ssf/2017/05/new_6-story_building_on_ann_ar.html
http://www.mlive.com/business/ann-arbor/index.ssf/2017/04/plans_for_6-story_building_on.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/12/see_plans_for_6-story_office_b.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/08/plans_for_6-story_downtown_ann.html
https://localwiki.org/ann-arbor/315_S_Main_St
327 E Hoover
327 E Hoover - Approved
Six unit apartment building with ground floor retail south of downtown near Michigan Stadium.
Floors: 4
Height: 55 feet
Parking Spaces: 9
Cost: $3M
Total Square Feet: 17176
Residential Units: 6
Bedrooms: 18
Retail Square Feet: 885
https://www.mlive.com/news/ann-arbor/2019/04/new-apartments-next-to-noisy-train-tracks-get-ann-arbor-councils-ok.html
https://www.mlive.com/expo/news/erry-2018/12/f4da1b26d51093/solarpowered-apartments-overlo.html
410 First
410 N First Ave. - Complete
24 condo units in a 4 story building just north of downtown. Each unit has 1 to 3 bedroom. The target market looks to be empty nesters and young professionals. Move ins are ongoing as of early 2018.
Construction Start: Summer 2016
Construction Finish: Spring 2018
Floors: 4
Height: 54 feet
Parking Spaces: 36
Cost: $7.5M
Total Square Feet: 47140
Residential Units: 24
Bedrooms: 50
http://410first.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2015/10/new_condo_development_on_first.html
https://localwiki.org/ann-arbor/410_First
414 Main
414 N Main St - Complete
Townhouse development on Main Street at the north end of downtown.
Construction Start: 2013
Construction Finish: Fall 2015
Floors: 4
Height: 48 feet
Parking Spaces: 55
Total Square Feet: 31385
Residential Units: 17
Bedrooms: 38
http://www.savarinoproperties.com/developments-2/
http://www.mlive.com/business/ann-arbor/index.ssf/2013/10/developer_units_nearly_sold_ou.html
415 W Washington
415 W Washington - Concept
Discussions are ongoing about what to do with this abandoned city owned property. Demolition of the old structure is possible in the near term.
https://www.mlive.com/news/ann-arbor/2019/08/ann-arbor-hires-consultant-to-evaluate-development-options-for-blighted-site.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/ann_arbor_to_study_saving_chim.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/blighted_city_buildings_in_his.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/group_wants_to_save_ann_arbor.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/08/reports_shed_light_on_pollutio.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/08/ann_arbor_exploring_options_fo.html
417 E Liberty
417 E Liberty - Concept
Ground lease available to build larger building at the Encore Records site on Liberty. Rumor is something is in the works
Total Square Feet: 55000
Residential Units: 150
http://www.triadrepartners.com/property/417-e-liberty
https://www.mlive.com/news/ann-arbor/2019/07/encore-records-shop-to-move-to-kerrytown-offers-big-sale.html
600 E Washington
600 E Washington - Proposed
Large mixed use structure proposed on Washington St behind the Michigan Theater.
Floors: 19
Height: 208 feet
Parking Spaces: 127
Total Square Feet: 254316
Residential Units: 241
Bedrooms: 466
Retail Square Feet: 6075
https://www.mlive.com/news/ann-arbor/2019/10/19-story-high-rise-behind-michigan-theater-gets-initial-ok.html
https://www.mlive.com/news/ann-arbor/2019/10/19-story-high-rise-behind-michigan-theater-up-for-approval.html
https://www.mlive.com/news/ann-arbor/2019/07/high-rise-developer-buys-property-from-michigan-theater-for-3m.html
https://www.mlive.com/expo/news/erry-2018/12/54dd5ad3cd2925/19story-highrise-proposed-behi.html
611 S Ashley
611 S Ashley - Stalled
11 apartment addition to the existing 618 S Main young professional focused apartment building. May be cancelled as of early 2019?
Floors: 5
Height: 58 feet
Residential Units: 11
Bedrooms: 11
618 S Main
618 S Main - Complete
Apartment building south of downtown on Main Street targeted at young professionals, graduate students, and empty nesters.
Construction Start: 2014
Construction Finish: Fall 2015
Floors: 6
Height: 75 feet
Parking Spaces: 130
Total Square Feet: 133113
Residential Units: 164
Bedrooms: 195
https://www.618southmain.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2015/05/inside_618_south_main.html
https://localwiki.org/ann-arbor/618_South_Main
721 N Main
721 N Main - Concept
Site proposed by the city council for affordable housing. This is the former location of the Ann Arbor city fleet. This land is also marked as being a key part of the Treeline greenway proect.
https://www.mlive.com/news/ann-arbor/2019/03/ann-arbor-exploring-new-options-for-affordable-housing-on-3-sites.html
950 Greene
950 Greene - Under Construction
Apartment building southwest of campus with a small amount of retail space. Units are mostly studios and one bedrooms.
Construction Start: 2019
Construction Finish: Summer 2020
Floors: 4
Height: 55 feet
Parking Spaces: 176
Cost: $26M
Total Square Feet: 140195
Residential Units: 167
Bedrooms: 181
Retail Square Feet: 2460
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/residents_moving_out_as_entire.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/ann_arbor_oks_171_apartments_t.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/redevelopment_of_entire_ann_ar.html
https://treedowntown.com/2017/12/10/new-mixed-use-project-proposed-near-michigan-stadium/
A Alfred Taubman Wing - Architecture School
2000 Bonisteel Blvd - Complete
Addition to and partial renovation of the University of Michigan's Art and Architecture Building.
Construction Start: Fall 2015
Construction Finish: Summer 2017
Floors: 3
Cost: $28.5M
Total Square Feet: 37000
http://umaec.umich.edu/projects/completed-projects/a-alfred-taubman-wing-project/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/09/umich_unveils_new_wing_of_taub.html
Ann Arbor Campus Hotel
402 E Huron - Proposed
Proposed mid-rise hotel at the site of the auto repair shop at Huron and Division.
Floors: 9
Height: 94 feet
Total Square Feet: 78012
Hotel Rooms: 160
https://www.mlive.com/news/ann-arbor/2019/08/9-story-hotel-proposed-on-firestone-site-in-downtown-ann-arbor.html
Ann Arbor Housing Commission - Platt East Project
3451 Platt - Approved
Housing Commission project to develop 4 buildings of low income rental housing on the southeast side of the city. Several low income units that currently exist on the site would be demoslished.
Construction Start: 2019
Construction Finish: Winter 2020
Floors: 2
Height: 23 feet
Parking Spaces: 56
Cost: $2.5M
Total Square Feet: 36055
Residential Units: 32
Bedrooms: 78
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/henry_street_platt_road_afford.html
Ann Arbor Station
Fuller Rd - Concept
Planned project to replace Ann Arbor's existing Amtrak Station. The station would be placed above the railroad tracks and would be fronted by a large parking structure in Fuller Park. Subject to much controversy due to the relocation from Depot St to Fuller Park and the cost of the project. This will require a public vote in order to move forward.
Cost: $86M
Total Square Feet: 8494
https://www.a2gov.org/departments/systems-planning/planning-areas/transportation/Pages/Ann-Arbor-Station.aspx
https://www.mlive.com/news/ann-arbor/2019/02/feds-raise-concerns-about-high-cost-of-proposed-ann-arbor-train-station.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/ann_arbor_train_station_projec.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/ann_arbor_releases_new_drawing.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/08/dig_at_fuller_park_next_step_f.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_still_waiting_for_fe.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/01/new_train_station_for_ann_arbo.html
https://treedowntown.com/2017/11/02/a-new-ann-arbor-train-station-time-to-weigh-in/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/09/what_an_81m_train_station_coul.html
https://localwiki.org/ann-arbor/Ann_Arbor_Station
Ann Ashley Garage Addition
220 N Ashley St - Proposed
Project to add three new levels containing 375 parking spaces to the Ann Ashley parking structure, bringing the total size to nine levels and 1202 parking spaces. The development may also involve architectural changes to the existing structure and the addition of new retail spaces on the ground floor.
Floors: 9
Parking Spaces: 375
Cost: $23M
https://www.mlive.com/news/ann-arbor/2019/10/more-parking-needed-to-support-growing-downtown-workforce-ann-arbor-spark-says.html
https://www.mlive.com/news/ann-arbor/2019/10/council-blocks-23m-expansion-of-downtown-ann-arbor-parking-deck.html
https://www.mlive.com/news/ann-arbor/2019/09/ann-arbor-council-rejects-4m-plan-for-new-dda-office-meeting-space.html
https://www.mlive.com/news/ann-arbor/2019/08/ann-arbor-considering-4m-plan-for-new-dda-office-meeting-space.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/makeover_of_ann_arbor_parking.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/budget_for_ann_arbor_parking_d.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/03/see_plans_for_transformative_m.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/01/ann_arbor_parking_garage_could.html
ArborBlu
624 Church - Complete
Student apartment tower above Pizza House in the South U area.
Construction Start: Spring 2014
Construction Finish: Summer 2015
Floors: 13
Height: 148 feet
Parking Spaces: 5
Total Square Feet: 132012
Residential Units: 123
Bedrooms: 242
http://www.sterlinghousing.com/ann-arbor-mi/sterling-arbor-blu/
http://www.mlive.com/business/ann-arbor/index.ssf/2015/10/arborblu_apartments_offers_unm.html
Athletics Operations Center
S State - Complete
Centralized facility for various University athletics related jobs just south of the main athletic complex.
Construction Start: Fall 2014
Construction Finish: Fall 2015
Floors: 1
Cost: $6M
Total Square Feet: 18000
http://umaec.umich.edu/projects/completed-projects/department-of-intercollegiate-athletics-operations-center/
http://www.mlive.com/news/ann-arbor/index.ssf/2014/04/designs_approved_for_6m_athlet.html
Atwell State Street Retail
3695 S State - Concept
Two single story retail buildings on State St south of I-94.
Floors: 1
Total Square Feet: 15600
Retail Square Feet: 15600
https://www.cpix.net/listing/30336355/3695-S-State-St-Ann-Arbor-MI-48108
Balfour Senior Housing
2874 S Main St - Under Construction
Senior housing near Briarwood. Mix of independent living, assisted living, and memory care.
Construction Start: Spring 2018
Construction Finish: Fall 2019
Floors: 4
Height: 55 feet
Parking Spaces: 134
Cost: $35M
Total Square Feet: 187000
Residential Units: 150
https://balfourcare.com/locations/ann-arbor/
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/upscale_senior_living_facility.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/07/35m_senior_housing_development.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/02/35m_senior-living_community_pr.html
Banyan Court
1654 S Maple Rd - Under Construction
8 single family home subdivision off of S Maple in the south west corner of the city. Each house will be around 1800 square feet in size and will be marketed at empty nesters. 3 to 4 bedrooms per house. Price range is $415,000 to $455,000. Mostly complete as of early 2019, some homes still being built.
Construction Start: Winter 2017
Construction Finish: 2019
Floors: 2
Total Square Feet: 14520
Residential Units: 8
Bedrooms: 28
http://www.annarborbuilders.com/banyan-court
http://www.secondwavemedia.com/concentrate/devnews/banyancourtannarborbuilders0362.aspx
http://www.mlive.com/news/ann-arbor/index.ssf/2015/11/planning_commissioners_design.html
Biological Sciences Building
1139 N University Ave - Complete
The University of Michigan's new home for the biology department and the Museum of Natural History.
Construction Start: Spring 2015
Construction Finish: Spring 2018
Floors: 7
Cost: $261M
Total Square Feet: 300000
http://umaec.umich.edu/projects/major-projects/biological-science-building/
http://www.mlive.com/news/ann-arbor/index.ssf/2016/08/progress_continues_on_261m_bio.html
Blue Heron Pond
2536 W Liberty - Under Construction
Townhome and flats subdivision on the west side of the city that is partially complete. A total of 64 units across 10 buildings are planned. Each unit consists of 2 to 3 bedrooms. The buildings are in various states of complete, under construction, and awaiting construction as of 2019.
Construction Finish: 2019
Floors: 4
Height: 40 feet
Total Square Feet: 111946
Residential Units: 64
https://www.norfolk-homes.com/communities/ann-arbor/blue-heron-pond-townhomes
http://www.mlive.com/business/ann-arbor/index.ssf/2015/08/long_dormant_ann_arbor_develop.html
https://localwiki.org/ann-arbor/Blue_Heron_Pond_Condominiums
Brightdawn Village
2805 Burton - Stalled
160 market rate apartments across 4 buildings in the southeast corner of the city. Each unit is 1 to 3 bedrooms. This is the location of previous proposed projects over the past decade, and a homeless encampment until 2014. Based on planning reviews in late 2018 and early 2019 this looks likey to be rejected based on it not conforming to zoning or to the master plan vision for the area. The developer may come back with a smaller by-right proposal.
Floors: 4
Parking Spaces: 240
Residential Units: 160
https://www.mlive.com/news/ann-arbor/2019/06/ann-arbor-city-council-rejects-brightdawn-village-rezoning.html
https://www.mlive.com/news/ann-arbor/2019/06/contested-brightdawn-village-rezoning-heads-to-ann-arbor-city-council.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/brightdawn_village_developer_c.html#incart_river_index
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/see_plans_for_160-unit_brightd.html
Bristol Ridge
2750 Pontiac Trail - Approved
69 townhomes on the north side of the city off Pontiac Trail. The units will be owner occupied and ~1850 square feet in size. The target market is young professionals and empty nesters.
Height: 45 feet
Parking Spaces: 174
Cost: $8.4M
Total Square Feet: 127650
Residential Units: 69
https://www.mlive.com/news/ann-arbor/2019/06/69-unit-townhome-development-on-pontiac-trail-gets-ann-arbors-ok.html
https://www.mlive.com/news/ann-arbor/2019/02/84m-condo-development-on-pontiac-trail-gets-initial-ok.html
Broadway Park
841 Broadway St - Proposed
Redevelopment of the vacant MichCon / DTE site along the Huron River just north of the train station. The initial concept calls for 100 condos, retail space, a hotel, and lots of open space. To be built in two phases.
Height: 98 feet
Parking Spaces: 486
Cost: $100M
Total Square Feet: 358477
Residential Units: 104
Hotel Rooms: 132
Retail Square Feet: 18500
https://www.mlive.com/news/ann-arbor/2019/08/tax-incentives-for-polluted-ann-arbor-site-get-countys-ok.html
https://www.mlive.com/news/ann-arbor/2019/07/173m-in-tax-incentives-to-help-fund-ann-arbor-riverfront-redevelopment.html
https://www.mlive.com/news/ann-arbor/2019/07/ann-arbor-paves-way-for-transformation-of-black-eye-along-citys-riverfront.html
https://www.mlive.com/news/ann-arbor/2019/06/ann-arbor-gives-initial-ok-to-75m-riverfront-redevelopment-plan.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/08/see_plans_for_75m_redevelopmen.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/dte_unveils_plan_for_75m_river.html
Bryant Community Center Addition
3 W Eden Ct - Complete
Connector for the two existing Bryant Community Center buildings on the far south side.
Construction Start: Fall 2018
Construction Finish: Fall 2018
Floors: 1
Height: 17 feet
Total Square Feet: 887
https://www.a2gov.org/departments/Parks-Recreation/parks-places/Bryant-Northside-Community-Centers/Pages/default.aspx
https://www.mlive.com/news/ann-arbor/2019/01/bryant-community-center-remodel-adds-space-for-youth-programs-food-pantry.html
https://www.mlive.com/news/ann-arbor/index.ssf/2017/10/ann_arbor_approves_316k_contra.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/06/300k_bryant_center_expansion_m.html
Central Campus Classrooms Building
North University - Under Construction
100,000 square foot addition and 134,000 square foot renovation of the Ruthven Museums Building. The Museum of Natural History is moving to the new Biological Sciences Building upon its completion. University administration, classrooms, and dry lab space will use the renovated and expanded museums building. The 1964 wing of the building will be demolished and replaced with a new building for large classrooms. Demoltiion of the existing addition was under way in early 2019.
Construction Start: Fall 2018
Construction Finish: Fall 2021
Cost: $150M
Total Square Feet: 100000
http://umaec.umich.edu/projects/major-projects/alexander-g-ruthven-museums-building-renovation-and-addition/
https://www.mlive.com/news/ann-arbor/2018/12/university-of-michigan-unveils-plans-for-160m-museums-building.html
https://record.umich.edu/articles/new-central-campus-building-include-innovative-classrooms
https://www.mlive.com/news/ann-arbor/index.ssf/2018/12/university_of_michigan_to_unve.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/12/ruthven_museum_reuse_approved.html
Central Campus Recreation Building Replacement
Washtenaw - Proposed
Complete replacement of the Central Campus Recreation Building.
Cost: $150M
Total Square Feet: 200000
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/university_of_michigan_regents_40.html
Circle K Rebuild
1420 E Stadium - Complete
Tear down and rebuild of the existing Circle K gas station at the corner of Packard and Stadium.
Construction Start: Winter 2018
Construction Finish: Fall 2018
Floors: 1
Parking Spaces: 14
Total Square Feet: 4000
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/long-debated_circle_k_redevelo.html
http://a2retail.space/2017/06/21/new-circle-k-on-the-way-at-stadium-and-packard-plans-approved/
https://localwiki.org/ann-arbor/Circle_K
College of Pharmacy Building
Huron St - Proposed
New home for the university College of Pharmacy. The school will move out of its existing building behind CC Little on Church St.
Cost: $121M
Total Square Feet: 130000
https://umaec.umich.edu/projects/major-projects/new-building-for-the-college-of-pharmacy/
Concordia Gym Addition
4090 Geddes Road - Stalled
Gym expansion on Concordia's campus. No updates in a long while as of summer 2018.
Floors: 3
Height: 39 feet
Parking Spaces: 92
Total Square Feet: 34391
Cottages at Barton Green
2601 Pontiac Trail - Approved
221 unit apartment community for university students on Ann Arbor's north side. Multiple duplexes and townhomes, and a clubhouse with a pool. This would be the first large development tageted at University of Michigan students a significant distance from campus. Shuttles would run between the complex and Central / North Campus. Rejected by the city council in September 2018. A modified version of the same proposal was then approved in July 2019 to avoid a lawsuit from the developer.
Floors: 3
Height: 35 feet
Parking Spaces: 559
Cost: $28M
Residential Units: 221
Bedrooms: 710
https://www.mlive.com/news/ann-arbor/2019/07/ann-arbor-settles-lawsuit-with-student-housing-developer.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/ann_arbor_facing_lawsuit_from.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/ann_arbor_rejects_controversia.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/07/ann_arbor_sends_student_housin.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/710-bed_student_housing_projec.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/03/neighbors_oppose_710-bed_stude.html
Crestview Condominiums
904 S Main - Complete
4 unit townhouse development at S Main and Davis. This is targeted at empty nesters and young professionals and is very similar to the recently completed Davis Row a little further down Davis. Priced from $879,000 for 4 bedrooms, 3.5 bathrooms over 2800 square feet.
Construction Start: Fall 2017
Construction Finish: Fall 2018
Floors: 3
Height: 28 feet
Parking Spaces: 8
Cost: $0.75M
Total Square Feet: 11098
Residential Units: 4
Bedrooms: 12
https://www.crestviewcondosa2.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/development_plans_approved_for.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/04/main_davis_condos.html
Davis Row
309 W Davis - Complete
4 unit townhouse development south of downtown.
Construction Start: Winter 2016
Construction Finish: Summer 2017
Floors: 3
Height: 26 feet
Parking Spaces: 8
Total Square Feet: 8656
Residential Units: 4
Bedrooms: 12
http://mavendevelopment.com/portfolio_page/303-309-w-davis/
http://www.mlive.com/news/ann-arbor/index.ssf/2015/10/ann_arbor_officials_approve_da.html
https://localwiki.org/ann-arbor/Davis_Row
Dean Road Transportation Facility
- Proposed
University of Michigan bus operations and maintenance facility. Would replace the north campus laundry building. A previous proposed transportation operations center that was supposed to be built nearby was cancelled in 2016.
Cost: $39M
Total Square Feet: 70000
https://record.umich.edu/articles/new-transportation-facility-be-constructed-north-campus
https://www.mlive.com/news/ann-arbor/index.ssf/2018/12/university_of_michigan_proposi_3.html
www.umaec.umich.edu/projects/completed-projects/transportation-operations-and-maintenance-facility/
Dental School Addition
1011 N University - Under Construction
An expansion of the university's dental school building to largely fill in the existing courtyard. A 176,000 square foot rennovation of the existing building is part of this project.
Construction Start: Fall 2018
Construction Finish: Spring 2022
Cost: $140M
Total Square Feet: 48000
http://umaec.umich.edu/projects/major-projects/w-k-kellogg-institute-and-dental-building-expansion-and-renovation/
http://media.dent.umich.edu/sites/building-renovation/
https://www.mlive.com/expo/news/erry-2018/10/40a57485be8829/university-of-michigan-breaks.html
Department of Dance Building
1100 Baits - Under Construction
Addition to the University's School of Music for the Dance Department. Proposed at the May 2018 Regents Meeting.
Construction Start: Summer 2019
Construction Finish: Spring 2021
Cost: $19M
Total Square Feet: 24000
http://umaec.umich.edu/projects/major-projects/new-dance-building/
Detroit Flatiron
544 Detroit St - Complete
Triangular building at the north end of Kerrytown with office space for Maven Development on the first floor and one residential unit on the second and third floors.
Construction Start: Summer 2014
Construction Finish: Fall 2015
Floors: 3
Height: 39 feet
Parking Spaces: 5
Total Square Feet: 4077
Residential Units: 1
Office Square Feet: 857
http://mavendevelopment.com/portfolio_page/the-flatiron-of-detroit-street/
http://www.annarbor.com/business-review/3-story-development-on-detroit-street-wins-approval-from-ann-arbor-historic-district-commission/
Elroy's Place
321 N Main St - Approved
Retail, office, and residential space on North Main St. The planned retail use is for personal fitness, yoga, and a spa. The residential space is planned as 4 or 5 apartments. Formerly this was the site of the proposed bath house. This project appears to be moving towards construction as of February 2019.
Floors: 6
Height: 66 feet
Parking Spaces: 16
Total Square Feet: 32893
Residential Units: 18
Bedrooms: 21
Retail Square Feet: 5782
Office Square Feet: 11000
https://www.mlive.com/news/ann-arbor/index.ssf/2018/07/6-story_solar-powered_developm.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/main_street_development_with_j.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/6m_project_with_jetsons-inspir.html
Fingerle Arbor Bar
545 S Main - Proposed
Proposed brewery and restaurant on the site of old Fingerle Lumber storage buildings. Plans include reusing and expanding the existing structures.
Floors: 2
Height: 30 feet
Parking Spaces: 12
Total Square Feet: 13336
Retail Square Feet: 13336
https://www.mlive.com/news/ann-arbor/2019/03/new-brewery-restaurant-with-rooftop-patio-proposed-for-fingerle-lumber-sheds-on-main-street.html
Ford Motor Company Robotics Building
- Under Construction
University of Michigan building for robotics research on North Campus.
Construction Start: Winter 2018
Construction Finish: Winter 2020
Floors: 4
Cost: $75M
Total Square Feet: 140000
http://umaec.umich.edu/projects/major-projects/robotics-laboratory/
Foundry Lofts
413 E Huron - Complete
Student targeted apartment building between central campus and Main Street.
Construction Start: 2014
Construction Finish: Spring 2016
Floors: 14
Height: 150 feet
Parking Spaces: 116
Total Square Feet: 265815
Residential Units: 209
Bedrooms: 550
Retail Square Feet: 5163
https://www.foundryloftsannarbor.com/
http://www.mlive.com/business/ann-arbor/index.ssf/2016/04/foundry_lofts_movein.html
https://localwiki.org/ann-arbor/Foundry_Lofts
Game Day Condos
1300 S Main St - Approved
5 unit condo complex across the street from Michigan Stadium. Each unit has two bedrooms and is to be marketed as second homes for Michigan football fans.
Floors: 4
Height: 55 feet
Parking Spaces: 18
Total Square Feet: 6825
Residential Units: 5
Bedrooms: 10
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/game_day_condos_project_near_m.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/see_latest_plans_for_game_day.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/developer_proposing_game_day_c.html
Gift of Life Addition
3861 Research Park - Complete
Addition to combine the existing buildings for Gift of Life Michigan. Located off South State south of 94.
Construction Start: Summer 2014
Construction Finish: Spring 2016
Floors: 3
Height: 34 feet
Parking Spaces: 186
Cost: $12.3M
Total Square Feet: 40786
Office Square Feet: 40786
http://www.giftoflifemichigan.org/news-calendar/latest-news/gift-life-begins-recovering-organs-and-tissue-new-ann-arbor-surgical
http://www.mlive.com/news/ann-arbor/index.ssf/2014/09/gift_of_life_michigan_launches.html
Glen Hotel
- Approved
162 hotel rooms, 24 apartments, and ground floor retail near the University Medical Center. Modifications to plan being reviewed as of early 2019.
Floors: 9
Height: 109 feet
Parking Spaces: 252
Cost: $40M
Total Square Feet: 139903
Residential Units: 24
Hotel Rooms: 162
https://www.mlive.com/news/ann-arbor/2018/12/40m-mixed-use-development-in-ann-arbor-to-break-ground-in-2019.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/12/40m_hotel_development_near_umi.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/9-story_project_on_unusual_sit.html
https://treedowntown.com/2017/07/26/update-on-the-glen-project/
Hampton Inn West
2910 Jackson - Complete
Hotel on the far west side of the city.
Construction Start: 2015
Construction Finish: Summer 2016
Floors: 4
Height: 43 feet
Parking Spaces: 170
Total Square Feet: 51608
Hotel Rooms: 100
http://hamptoninn3.hilton.com/en/hotels/michigan/hampton-inn-and-suites-ann-arbor-west-ARBWEHX/index.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/07/hampton_inn_opens_new_hotel_in.html
Henry Street Residential
814 Henry St - Approved
11 unit student / young professional townhome focused development to the south of campus off of Stadium. Looks to be moving quickly towards construction as of Spring 2019.
Floors: 3
Height: 30 feet
Parking Spaces: 18
Total Square Feet: 25623
Residential Units: 11
Bedrooms: 64
https://www.mlive.com/news/ann-arbor/2019/02/group-living-with-co-working-space-for-young-professionals-coming-to-ann-arbor.html
https://www.mlive.com/news/ann-arbor/2019/02/ann-arbor-officials-see-hope-for-car-free-lifestyle-in-new-development.html
Hickory Way Apartments by Avalon
1120 S Maple Road - Approved
70 apartments in two 3 story buildings. Mostly one bedroom units, some two bedroom units. Reserved for people making under 50% of the area median income, some units for people making under 30%. Utility work underway as of late 2017. Construction work looks to be starting soon as of early 2019.
Construction Start: 2019
Construction Finish: 2020
Floors: 3
Parking Spaces: 105
Cost: $10M
Total Square Feet: 98281
Residential Units: 70
http://www.avalonhousing.org/our-work/core-programs/
https://www.clickondetroit.com/all-about-ann-arbor/avalon-housing-gets-green-light-to-begin-work-on-affordable-housing-units-in-ann-arbor
https://www.mlive.com/news/ann-arbor/index.ssf/2018/07/hickory_way_avalon_housing.html
https://www.mlive.com/news/ann-arbor/2017/03/ann_arbor_kicking_in_public_fu.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/08/10m_affordable_housing_develop.html
Hideaway Lane
2000 Traver Rd - Proposed
Completion of a partially built condo community on the north side of the city. 35 new units, mostly duplexes, to be added. 34 two bedroom units and one 3 bedroom single family home.
Floors: 2
Parking Spaces: 80
Total Square Feet: 47000
Residential Units: 35
Bedrooms: 81
http://www.annarbor.com/business-review/hideaway-lane-developers-revive-plans-to-build-19-homes-on-ann-arbors-north-side/
Hillside Memory Care Addition
312 Glendale Drive - Approved
Memory care addition to the existing Hillside Terrace retirement community on the west side of the city. Consists of 24 rooms. Slowly moving towards construction as of summer 2019?
Floors: 1
Height: 19 feet
Parking Spaces: 21
Total Square Feet: 16743
Residential Units: 24
Bedrooms: 24
http://hillsideterrace.net/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/04/memory_care_center_approved_fo.html
https://localwiki.org/ann-arbor/Hillside_Terrace_Retirement_Residence
Hilton Home2 Hotel
361 W Eisenhower Pkwy - Proposed
115 room hotel just west of Briarwood Mall.
Floors: 4
Parking Spaces: 115
Hotel Rooms: 115
https://www.mlive.com/news/ann-arbor/2018/12/115-room-hotel-proposed-on-ann-arbors-south-side.html
Holiday Inn Express
3853 Research Park Drive - Under Construction
114 room hotel on the far south side of Ann Arbor.
Construction Start: Summer 2018
Floors: 4
Height: 45 feet
Parking Spaces: 114
Cost: $5M
Total Square Feet: 64518
Hotel Rooms: 114
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/114-room_hotel_off_state_stree.html
Homewood Suites
2457 S. State St - Approved
107 room hotel on S State St near the new athletic campus. Construction close to starting as of early 2019.
Floors: 5
Height: 55 feet
Parking Spaces: 107
Total Square Feet: 83019
Hotel Rooms: 107
https://www.mlive.com/news/ann-arbor/index.ssf/2018/07/plans_for_107-room_homewood_su.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/plans_for_new_107-room_hotel_h.html
Hospital Expansion at Markley
- Concept
https://expo.mlive.com/news/g66l-2019/07/0927aa4dcb704/moving-schools-new-student-housing-part-of-university-of-michigans-5year-plan.html
https://www.mlive.com/news/ann-arbor/2019/07/university-of-michigan-eyes-student-housing-as-construction-on-former-fingerle-property-begins.html
Hub on Campus
603 E Huron - Complete
124 apartments targeted at students. On Huron St near Central Campus. Each unit ranges from studios to 4 bedrooms in size. Monthly lease ranges from $1200 - $2000 per person per month depending on the unit size.
Construction Start: Fall 2016
Construction Finish: Summer 2018
Floors: 12
Height: 120 feet
Parking Spaces: 108
Cost: $22M
Total Square Feet: 171415
Residential Units: 124
Bedrooms: 310
https://www.americancampus.com/student-apartments/mi/ann-arbor/hub-ann-arbor/home
http://www.mlive.com/news/ann-arbor/index.ssf/2016/03/neighbors_praise_developer_as.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/01/proposed_12-story_high_rise_in.html
https://localwiki.org/ann-arbor/The_Calvin
Hyatt Place
3223 S State St - Complete
142 room hotel with 2,800 sqft retail space in front
Construction Start: 2016
Construction Finish: Fall 2017
Total Square Feet: 90300
Hotel Rooms: 142
Retail Square Feet: 2800
https://annarbor.place.hyatt.com/en/hotel/home.html
Jackson Ave Hotels
2800 Jackson Ave - Proposed
Two new hotels on Jackson Ave just past 94 on the site of the old Michigan Inn site. Based on the site plans the hotels may be an Aloft and a Home2 Suites.
Floors: 4
Height: 55 feet
Parking Spaces: 246
Total Square Feet: 135035
Hotel Rooms: 243
Jeff T. Blau Hall
- Complete
New building at the University's Business School. Replaced an existing building. This project also included the renovation of other space in the school.
Construction Start: Spring 2014
Construction Finish: Fall 2016
Floors: 6
Cost: $135M
Total Square Feet: 104000
http://umaec.umich.edu/projects/completed-projects/stephen-m-ross-school-of-business-kresge-renovation-and-new-academic-building/
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/ross_business_school_renovatio.html
Kingsley Condos
314 W Kingsley St. - Complete
51 condos consisting of 1 to 3 bedrooms in between Kerrytown and Water Hill, north of downtown. This is the former site of JC Beal Construction. The target market looks to be empty nesters and young professionals. Sample pricing: ~$600,000 for 2 bedrooms and bathrooms over 1,400 square feet.
Construction Start: Summer 2017
Construction Finish: Summer 2019
Floors: 5
Height: 60 feet
Parking Spaces: 93
Cost: $35M
Total Square Feet: 89480
Residential Units: 51
Bedrooms: 102
http://www.kingsleycondos.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/07/kingsley_condos.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/08/kingsley_condominiums_to_break.html
Kingsley Parkside
213 W Kingsley - Complete
5 story 3 unit luxury condo building north of downtown. 2 bedrooms per unit. $959,000 for a 1600 square foot unit.
Construction Start: Summer 2017
Construction Finish: Fall 2018
Floors: 5
Height: 58 feet
Parking Spaces: 5
Total Square Feet: 6372
Residential Units: 3
Bedrooms: 6
http://kingsleyparkside.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2016/05/city_council_approves_kingsley.html
http://www.mlive.com/news/ann-arbor/index.ssf/2015/07/5-story_condo_building_propose.html
https://localwiki.org/ann-arbor/Kingsley_Parkside
Kingsley West
121 W Kingsley - Complete
Condo complex north of downtown.
Construction Start: 2015
Construction Finish: Winter 2017
Floors: 6
Height: 58 feet
Parking Spaces: 36
Total Square Feet: 40689
Residential Units: 18
Bedrooms: 43
http://www.savarinoproperties.com/developments-2/
http://www.mlive.com/news/ann-arbor/index.ssf/2014/09/demand_strong_for_new_kingsley.html
https://localwiki.org/ann-arbor/121_Kingsley_West
Kraus Building Addition
830 N University Ave - Under Construction
Addition to the Kraus building to fill in the interior courtyard. A rennovation of the 160,000 square foot building is also a part of this project. This will begin once the Biology department has moved to the new Biological Science Building. The department of Kinesiology will move into the Kraus Building after the construction on it is complete.
Construction Start: Fall 2018
Construction Finish: Fall 2020
Cost: $120M
Total Square Feet: 62000
http://umaec.umich.edu/projects/major-projects/edward-henry-kraus-building-renovation-and-addition/
https://www.kines.umich.edu/kraus-construction-site-mobilization-begins
https://www.kines.umich.edu/newbuilding
LA Fitness
155 N Maple - Complete
Replacement of the old English Gardens building with new construction for an LA Fitness.
Construction Start: 2018
Construction Finish: Winter 2019
Floors: 1
Height: 35 feet
Parking Spaces: 170
Total Square Feet: 35000
Retail Square Feet: 35000
https://www.mlive.com/news/ann-arbor/index.ssf/2017/08/new_fitness_center_approved_fo.html
LSA Addition
500 S State - Under Construction
One floor addition onto the back of the existing LSA Building. A 24,000 square foot renovation of the building is also part of this project.
Construction Start: Fall 2017
Construction Finish: Winter 2020
Floors: 1
Cost: $35M
Total Square Feet: 21000
http://umaec.umich.edu/projects/major-projects/literature-science-and-the-arts-building-first-floor-renovation-and-addition/project-date/
Liberty Townhomes
2658 W Liberty St - Proposed
52 townhouse style apartments on the far west side of Ann Arbor. 3 bedrooms per unit. On hold as of April 2018. Possibly active again in mid 2019.
Floors: 4
Height: 38 feet
Parking Spaces: 109
Cost: $5.2M
Total Square Feet: 126100
Residential Units: 52
Bedrooms: 156
http://www.mlive.com/news/ann-arbor/index.ssf/2017/09/52m_apartment_complex_proposed.html
Lockwood of Ann Arbor
3365 Jackson Rd - Stalled
Senior independent living facility on the far west side. 20% of units to be dedicated as affordable housing. Rejected by the city council in March 2019.
Floors: 3
Parking Spaces: 65
Cost: $20M
Total Square Feet: 127000
Residential Units: 95
Bedrooms: 140
http://www.lockwoodcompanies.com/
https://www.mlive.com/news/ann-arbor/2019/03/ann-arbor-council-rejects-affordable-senior-housing-development.html
https://www.mlive.com/news/ann-arbor/2019/02/ann-arbor-council-unlikely-to-ok-plans-for-affordable-senior-housing.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/ann_arbor_neighbors_criticize.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/ann_arbor_neighbors_fighting_3.html
Madison on Main
101 W Madison St - Stalled
26 unit apartment building with 1267 sqft of retail space just south of downtown. This project was approved by the city council in 2015 but appears to have stalled out since then. Possibly moving towards construction as of summer 2019? Unclear because it sounds like the developer is starting construction, but the main approvals have expired?
Floors: 5
Height: 60 feet
Parking Spaces: 15
Total Square Feet: 32616
Residential Units: 26
Retail Square Feet: 1267
https://www.mlive.com/news/ann-arbor/2019/07/5-story-development-on-ann-arbors-main-street-moving-forward.html
http://sarokiarchitecture.com/blog/the-madison-on-main/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/05/financing_troubles_delay.html
https://localwiki.org/ann-arbor/The_Madison_on_Main
Main on the Park
542 N Main St - Complete
4 luxury townhomes on North Main St.
Construction Start: Winter 2016
Construction Finish: Winter 2017
Floors: 2
Height: 29 feet
Parking Spaces: 8
Total Square Feet: 8928
Residential Units: 4
Bedrooms: 12
https://mainonthepark.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2015/08/new_townhouses_on_main_street.html
Mallets Woods 2
3300 Cardinal Ave - Approved
19 single family home subdivision on the south east side of the city. The houses will have 3 to 4 bedrooms and be up to 2000 square feet in size.
Floors: 2
Total Square Feet: 42000
Residential Units: 19
https://www.mlive.com/news/ann-arbor/2019/03/19-new-homes-to-be-built-on-wooded-land-in-southeast-ann-arbor.html
https://www.mlive.com/news/ann-arbor/2019/01/19-home-development-proposed-in-southeast-ann-arbor.html
Maple Cove Building 1
1649 N Maple Rd - Complete
Four story apartment buildings with 18 units. Units are 1 to 2 bedrooms. One bedroom unit renting for $1240.
Construction Start: 2015
Construction Finish: 2017
Floors: 4
Parking Spaces: 54
Residential Units: 18
http://www.maplecoveofannarbor.com/
Maple Cove Building B
1645 N Maple Rd - Complete
Four story apartment buildings with 18 units. Units are 1 to 2 bedrooms.
Construction Start: Spring 2018
Construction Finish: Summer 2019
Floors: 4
Residential Units: 18
http://www.maplecoveofannarbor.com/
Maple Cove Condos
Maple Village Ct - Under Construction
Seven lot single family subdivision part of the Maple Cove project. Under construction as of 2018. Partially complete as of early 2019.
Residential Units: 7
http://www.maplecoveofannarbor.com/
Maple Shoppes Building #2
512 N Maple Rd - Stalled
New retail building on the same property as the existing Aldi at Maple and Dexter. This project was approved by the city council in 2016 but no permit activity has occurred since then so this may be stalled now. An earlier version of this project also was canceled after the site plan expired.
Floors: 1
Height: 23 feet
Total Square Feet: 7875
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/new_retail_building_approved_f.html
https://localwiki.org/ann-arbor/Maple_Shoppes
Maple Village Restaurant
N Maple - Proposed
New restaurant building proposed in the parking lot of Maple Village.
Floors: 1
Total Square Feet: 12500
Retail Square Feet: 12500
https://www.mlive.com/news/ann-arbor/index.ssf/2018/07/new_restaurant_building_propos.html
Meadowview Condominiums
2250 Ann Arbor Saline - Approved
Condo building proposed south of downtown. The units range in size from ~800 to ~2000 square feet and 1 to 3 bedrooms. This project was approved in 2015 and seems to becoming active again as of early 2018. Site plan extenstion requested in mid 2019.
Floors: 4
Height: 45 feet
Parking Spaces: 154
Total Square Feet: 86579
Residential Units: 75
Bedrooms: 132
https://localwiki.org/ann-arbor/2250_Ann_Arbor-Saline_Road
https://www.mlive.com/news/ann-arbor/2016/12/see_drawings_for_new_75-unit_c.html
Michigan Medicine Clinical Inpatient Tower
Ann St - Under Construction
New medical center building mentioned in the FY2019 UM capital outlay master plan. 264 patient beds planned.
Construction Start: Fall 2019
Construction Finish: Spring 2024
Floors: 12
Cost: $920M
Total Square Feet: 690000
http://umaec.umich.edu/projects/major-projects/mmed-clinical-inpatient-tower/
http://www.med.umich.edu/facilities/plan/project/index.html
https://www.mlive.com/news/ann-arbor/2019/10/um-breaks-ground-on-new-920-million-hospital-nurses-protest-employee-parking.html
https://www.mlive.com/news/ann-arbor/2019/09/university-of-michigan-approves-920-million-for-new-hospital.html
https://www.mlive.com/news/g66l-2019/09/c8a1e692016572/a-closer-look-at-plans-for-the-new-920m-university-of-michigan-hospital.html
https://record.umich.edu/articles/u-m-continues-planning-potential-new-adult-inpatient-hospital
http://www.mlive.com/news/ann-arbor/index.ssf/2018/03/um_exploring_construction_of_n.html
Midtown Condominiums
1400 S Maple Rd - Approved
253 condos, consisting of 174 apartments and 79 townhomes, in the southwest corner of the city. Each unit is 1 to 3 bedrooms. An update reducing the scope of this project is being floated as of Spring 2019.
Construction Start: Fall 2019
Construction Finish: Summer 2021
Floors: 3
Height: 37 feet
Parking Spaces: 445
Cost: $55M
Total Square Feet: 385865
Residential Units: 253
Bedrooms: 418
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/19-building_condo_development.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/256_condos_proposed_for_develo.html
Mitchell School Addition Phase 1
3550 Pittsview - Complete
Six new classrooms as Mitchell Elementary School on Ann Arbor's southeast side.
Construction Start: Winter 2016
Construction Finish: Summer 2016
Floors: 1
Cost: $2.19M
Total Square Feet: 8681
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/mitchell_elementary_unveils_ne.html
http://news.a2schools.org/school-board-approves-expansion-of-mitchell-elementary-school/
Mitchell School Addition Phase 2
3550 Pittsview Dr - Stalled
Planned second phase of additional space for Mitchell school. No word on this in a long while as of summer 2018. Two phases of modular classrooms have been added to the southwest corner of the school in the mean time.
http://news.a2schools.org/school-board-approves-expansion-of-mitchell-elementary-school/
Montgomery Houze
212 S Fourth Ave - Under Construction
41 apartments with ground floor retail downtown. Mix of studios, one and two bedroom units. This is a multi-story addition to an existing building. The project involves restoring the classic look of the old Montgomery Ward department store that this structure used to house.
Construction Start: Spring 2017
Floors: 5
Height: 81 feet
Total Square Feet: 38370
Residential Units: 41
Bedrooms: 52
http://www.montgomeryhouze.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/05/new_downtown_ann_arbor_apartme.html
https://treedowntown.com/2016/05/06/montgomery-houze-condo-development-coming-to-4th-avenue/
https://localwiki.org/ann-arbor/Montgomery_Houze
Munger Grad Residences
540 Thompson St - Complete
University of Michigan graduate student dorm for 600 students.
Construction Start: Spring 2013
Construction Finish: Summer 2015
Floors: 8
Cost: $185M
Total Square Feet: 370000
http://umaec.umich.edu/projects/completed-projects/munger-graduate-residencies/
http://www.mlive.com/news/ann-arbor/index.ssf/2015/07/heres_your_first_chance_to_see.html
https://localwiki.org/ann-arbor/Munger_Graduate_Residence_Hall
Near North
700 N Main St - Proposed
16 townhouse condos on North Main Street. Each unit would have 3 bedrooms and range from 2000 to 2400 square feet. This has been the site of stalled proposals over the years. Updates to this site plan were posted in July 2018 and it appears to continue to be moving forward as of early 2019.
Floors: 4
Height: 45 feet
Parking Spaces: 38
Cost: $13M
Total Square Feet: 35000
Residential Units: 16
Bedrooms: 48
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/new_condos_proposed_where_8_ho.html
https://treedowntown.com/2016/12/02/more-condos-proposed-for-north-main/
https://localwiki.org/ann-arbor/Near_North
North Maple Estates
701 N Maple - Complete
Affordable housing on Ann Arbor's northwest side run by the Ann Arbor Housing Commission. Replaced / refurbished the existing affordable apartments on this site.
Construction Start: 2016
Construction Finish: Spring 2017
Floors: 2
Height: 23 feet
Parking Spaces: 76
Total Square Feet: 60860
Residential Units: 46
Bedrooms: 150
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/a_tour_of_ann_arbors_newest_af.html
https://localwiki.org/ann-arbor/North_Maple_Estates
North Oaks Townhomes
2999 Nixon Rd - Under Construction
264 3 to 4 floor townhouses in new subdivision on the far north side of Ann Arbor. Formerly known as Nixon Farm South. Move ins began in fall 2017, deleveries ongoing.
Construction Start: 2017
Floors: 4
Residential Units: 264
https://www.tollbrothers.com/luxury-homes-for-sale/Michigan/North-Oaks-of-Ann-Arbor-The-Townhome-Collection
http://www.mlive.com/news/ann-arbor/index.ssf/2018/03/take_a_tour_of_north_oaks_luxu.html
North Oaks Villas
3381 Nixon Rd - Under Construction
208 carriage style home subdivision on the far north side of Ann Arbor. Exact mix of units to be determined by individual purchasers. Formerly known as Nixon Farm North. Deleveries to owners ongoing as of 2018.
Construction Start: 2017
Residential Units: 208
https://www.tollbrothers.com/luxury-homes-for-sale/Michigan/North-Oaks-of-Ann-Arbor-The-Villa-Collection
http://www.mlive.com/news/ann-arbor/index.ssf/2018/03/take_a_tour_of_north_oaks_luxu.html
North Sky
2701 Pontiac Trail - Under Construction
195 units, mostly single family with 2 or 3 bedrooms. One multi family building with 56 2 bedroom units. This project has been in the works for years. The houses are to be priced starting in the $400k range for 2,500+ square feet. Deleveries expected to begin in 2019.
Construction Start: 2017
Residential Units: 195
Bedrooms: 622
https://www.pulte.com/homes/michigan/detroit/ann-arbor/north-sky-209983
http://www.mlive.com/news/ann-arbor/index.ssf/2016/03/north_sky_housing_development.html
https://localwiki.org/ann-arbor/North_Sky
Northwood Replacement
- Concept
https://expo.mlive.com/news/g66l-2019/07/0927aa4dcb704/moving-schools-new-student-housing-part-of-university-of-michigans-5year-plan.html
OakCliff Apartments
2225 Traverwood - Complete
Apartment community off the Plymouth Road corridor.
Construction Start: Winter 2014
Construction Finish: Summer 2015
Floors: 2
Height: 27 feet
Parking Spaces: 334
Total Square Feet: 223472
Residential Units: 216
Bedrooms: 280
https://www.oakcliffapt.com/
http://www.mlive.com/business/ann-arbor/index.ssf/2015/09/tenants_now_moving_in_at_new_a.html
Old YMCA Lot
Fifth and William - Concept
Site of the former YMCA in downtown Ann Arbor. The old structure was demolished in 2008 and has been marked for mixed use redevelopment since then. The property is currently the subject of a legal dispute between the city and developer.
https://www.mlive.com/news/ann-arbor/2019/07/ann-arbor-oks-contract-for-community-driven-y-lot-concepts.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/ann_arbor_dda_pledges_745k_for.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/ann_arbor_approves_52m_deal_to.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/ann_arbor_considering_52m_deal.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/mayor_claims_y_lot_no_votes_ma.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/ann_arbor_council_votes_11-0_t_1.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/05/ann_arbor_releases_new_apprais.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/should_a_new_downtown_ann_arbo.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/should_a_new_downtown_ann_arbo.html
https://treedowntown.com/2018/04/23/the-y-lot-rock-i-presume-hard-place-i-presume/
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_official_who_may_be.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_housing_commission_d_1.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ackerman_and_taylor_lay_out_ne.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_reverses_foia_denial.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_has_2_new_options_to.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/dahlmanns_attorney_tells_city.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_official_who_may_be.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_officials_meeting_be.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_council_divided_over.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/ann_arbor_council_to_vote_on_b.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/developer_sues_ann_arbor_in_ho.html
http://www.mlive.com/news/ann-arbor/index.ssf/2014/04/city_completes_525m_sale_of_pr.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/10/new_high-rise_proposed_for_for.html
https://localwiki.org/ann-arbor/Old_YMCA
Owl Creek Apartments
3380 Nixon Rd - Under Construction
Rental apartment complex on the far north side of Ann Arbor. 264 apartments, mostly 1 and 2 bedroom units, some 3 bedroom units. Split across three 3 story apartment buildings and one smaller clubhouse building. Formerly known as Woodbury Club and The Annex. At least one building complete as of summer 2019.
Construction Start: Spring 2018
Construction Finish: 2019
Floors: 3
Parking Spaces: 550
Cost: $27.5M
Residential Units: 264
Bedrooms: 308
https://www.owlcreekapartments.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/277_new_apartments_coming_to_n.html
https://localwiki.org/ann-arbor/The_Annex
Pittsfield Retail Center
3570 Washtenaw - Complete
Additions to an existing strip mall on Wasthenaw across from ArborLand.
Construction Finish: 2016
Floors: 1
Total Square Feet: 16500
Retail Square Feet: 16500
Plymouth Green Crossing Building 3
3455 Plymouth Rd - Proposed
Proposal to complete the third building of Plymouth Green Crossing as a one story retail structure instead of three stories of mixed use like the other two buildings on the site.
Floors: 1
Total Square Feet: 7300
Retail Square Feet: 7300
Plymouth Mixed Use Development
3261 Plymouth Rd - Proposed
Tear down of most of the Plymouth Rd Red Roof Inn for a new hotel and rebuild of the Big Boy's restaurant for a new eatery.
Floors: 6
Height: 75 feet
Parking Spaces: 257
Total Square Feet: 90483
Hotel Rooms: 127
Retail Square Feet: 4355
Rainbow Child Care
2600 Nixon Rd - Stalled
Child care facility on the north east side of the city. Cancelled after Ann Arbor Public Schools purchased the property in January 2019. The school district has no plans for the site.
Floors: 1
Height: 26 feet
Parking Spaces: 41
Total Square Feet: 10782
https://www.mlive.com/news/ann-arbor/2019/01/ann-arbor-schools-buys-property-to-prevent-proposed-daycare-from-opening.html
Reinhart Project
2275 W Stadium - Complete
New office building for Reinhart Realtors and others on West Stadium.
Construction Start: Fall 2017
Construction Finish: Summer 2019
Floors: 2
Height: 42 feet
Parking Spaces: 122
Cost: $4M
Total Square Feet: 15381
Office Square Feet: 15381
http://www.mlive.com/news/ann-arbor/index.ssf/2017/03/4m_plan_for_new_office_buildin.html
https://localwiki.org/ann-arbor/2275_W._Stadium
Residence Inn Downtown
120 W Huron St - Complete
Downtown hotel with ground floor retail west of Main Street.
Construction Start: Summer 2014
Construction Finish: Fall 2015
Floors: 6
Height: 80 feet
Parking Spaces: 2
Total Square Feet: 91500
Hotel Rooms: 110
Retail Square Feet: 5580
http://www.marriott.com/hotels/travel/arbdt-residence-inn-ann-arbor-downtown/
http://www.mlive.com/business/ann-arbor/index.ssf/2015/10/downtown_ann_arbor_residence_i.html
https://localwiki.org/ann-arbor/The_Greyline
School of Music Brehm Pavilion
1100 Baits - Complete
Addition to the University's School of Music. Renovation of existing space was also part of this project.
Construction Start: Spring 2014
Construction Finish: Fall 2015
Cost: $29.5M
Total Square Feet: 21000
http://umaec.umich.edu/projects/completed-projects/earl-v-moore-building-renovation-and-brehm-pavilion/
School of Nursing
426 N Ingalls St - Complete
New home for University of Michigan's School of Nursing north of central campus and just west of the medical campus.
Construction Start: Summer 2013
Construction Finish: Fall 2015
Cost: $50M
Total Square Feet: 78000
http://nursing.umich.edu/about/news-portal/201509/4659
http://www.mlive.com/news/ann-arbor/index.ssf/2015/09/first_look_inside_u-m_50m_school_of_nursing.html
Six11
611 E University - Complete
14 story 90 unit student housing tower with 3,498 square feet of first floor retail. Units mix consists of studios and 4, 5, and 6 bedroom apartments. Per bedroom rates run from $1250 to $2000 a month.
Construction Start: Spring 2017
Construction Finish: Summer 2018
Floors: 14
Height: 150 feet
Parking Spaces: 79
Total Square Feet: 133814
Residential Units: 90
Bedrooms: 343
Retail Square Feet: 3498
http://www.livesix11.com/
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/see_inside_ann_arbors_new_six1.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/08/13-story_apartment_high-rise_i.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/06/14-story_29m_high_rise_on_east.html
http://www.mlive.com/business/ann-arbor/index.ssf/2016/01/14-story_student_high_rise_pro.html
South Athletic Complex
S State St - Complete
New home for the University of Michigan's track and field, cross country, lacrosse, soccer, and women's rowing teams.
Construction Start: Fall 2015
Construction Finish: Fall 2017
Cost: $168M
Total Square Feet: 280000
http://umaec.umich.edu/projects/major-projects/stephen-m-ross-athletic-campus-athletics-south-competition-and-performance-project/
South Pond Village
3850 E Huron River Dr - Approved
73 single family house subdivision behind Arborland. As of February 2018 a new proposal for this site is being floated consisting of 257,000 sqft of single floor retail - essientially an expansion to Arborland. Site plan extension requested in mid 2019.
Height: 30 feet
Residential Units: 73
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/initial_reactions_to_arborland.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/02/major_expansion_of_arborland_s.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/73_new_homes_approved_for_deve.html
https://www.mlive.com/news/ann-arbor/2016/06/south_pond_village_development.html
https://localwiki.org/ann-arbor/South_Pond_Village
Stadium View Condos
450-460 W Stadium - Complete
4 3000+ square feet condo units with 4 bedrooms and penthouse roof decks. One unit is listed for $1.2 million. The market for these units appears to be rich football fans looking for a second home? Or Airbnb property managers?
Construction Start: Fall 2016
Construction Finish: Fall 2018
Floors: 3
Height: 30 feet
Parking Spaces: 20
Total Square Feet: 12000
Residential Units: 4
Bedrooms: 16
http://stadiumviewcondominiums.com/
Standard at Ann Arbor
425 S Main - Proposed
New apartment building proposed for the DTE site on Main Street. Some ground floor retail included at the Main St / William intersection. Judging from the unit sizes and bedroom counts, this will be a student oriented development.
Floors: 9
Total Square Feet: 251626
Residential Units: 235
Bedrooms: 390
Retail Square Feet: 11315
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/block-long_redevelopment_plann.html
State Street Center
3945 S State St - Stalled
Second retail building behind the existing Jimmy John's on State Street south of 94. Building is mostly completed but unoccupied as of September 2018?
State Street Village
2225 S State - Complete
Two apartment buildings and one smaller leasing office on South State Street.
Construction Finish: 2016
Floors: 4
Height: 55 feet
Parking Spaces: 127
Cost: $10M
Total Square Feet: 116237
Residential Units: 78
http://www.mckinley.com/apartments/michigan/ann-arbor/state-street-village
http://www.mlive.com/business/ann-arbor/index.ssf/2016/02/state_street_village_apartment.html
https://localwiki.org/ann-arbor/State_Street_Village
Staybridge Suites
3850 Research Park - Complete
Hotel off of South State south of 94.
Construction Start: Fall 2015
Construction Finish: Spring 2017
Floors: 4
Height: 46 feet
Parking Spaces: 168
Total Square Feet: 90198
Hotel Rooms: 134
https://www.ihg.com/staybridge/hotels/us/en/ann-arbor/arbsb/hoteldetail
http://www.mlive.com/news/ann-arbor/index.ssf/2015/05/staybridge.html
The Collective on Fifth
319 S Fifth Ave - Stalled
Project on the library lot downtown consisting of 360 residential units, 131 hotel rooms, 20,000 sqft of office, 3300 sqft of retail, and a 12,000 sqft public plaza. Cancelled as a result of proposal A in the November 2018 election.
Floors: 17
Height: 150 feet
Cost: $80M
Total Square Feet: 352496
Residential Units: 360
Hotel Rooms: 131
Retail Square Feet: 3300
Office Square Feet: 20000
https://www.mlive.com/news/ann-arbor/2019/10/ann-arbor-residents-invited-to-share-ideas-for-center-of-the-city.h
https://www.mlive.com/news/ann-arbor/2019/06/ann-arbor-officials-want-to-start-activating-future-central-park-site.html
https://www.mlive.com/news/ann-arbor/2019/04/ann-arbor-forming-center-of-the-city-task-force-to-plan-park-at-library-lot.html
https://www.mlive.com/news/ann-arbor/2019/04/ann-arbor-forming-center-of-the-city-task-force-to-plan-park-at-library-lot.html
https://www.mlive.com/news/ann-arbor/2019/02/ann-arbor-may-form-center-of-the-city-task-force-for-central-park-plan.html
https://www.mlive.com/news/ann-arbor/2019/01/ann-arbor-settles-lawsuit-with-council-members-who-sued-over-high-rise-deal.html
https://www.mlive.com/news/ann-arbor/2019/01/ann-arbor-agrees-to-settle-lawsuit-brought-by-central-park-group.html
https://www.mlive.com/news/ann-arbor/2019/01/ann-arbor-may-have-to-pay-broker-220k-for-deal-that-didnt-pan-out.html
https://www.mlive.com/news/ann-arbor/2019/01/developer-objects-to-ann-arbor-canceling-17-story-high-rise-deal.html
https://www.mlive.com/news/ann-arbor/2018/12/ann-arbor-cancels-deal-for-17-story-high-rise-on-library-lot.html
https://www.mlive.com/expo/news/erry-2018/12/dc2e46b2982145/see-latest-plans-for-17story-h.html
https://www.mlive.com/news/ann-arbor/2018/12/library-lot-developer-asks-city-for-clarity-on-where-10m-deal-stands.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/central_park_supporters_offer.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/whats_next_for_ann_arbor_centr.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/court_decision_on_ann_arbors_l.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/proposal_a_affordable_housing.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/ann_arbor_central_park_proposa.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/11/ann_arbor_developer_open_to_co.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/can_ann_arbors_library_lot_sup.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/mayor_urges_voters_to_reject_a.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/library_board_unanimously_oppo.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/10/washtenaw_housing_alliance_opp.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/debate_over_ann_arbor_central.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/workforce_housing_library_lot.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/ann_arbor_council_votes_6-4_to.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/judge_hears_arguments_in_lawsu_1.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/08/judge_sides_with_city_in_dispu.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/post_93.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/ann_arbor_approves_ballot_lang.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/developer_invites_ann_arborite.html
http://www.mlive.com/news/ann-arbor/index.ssf/2018/06/ann_arbor_inks_deal_to_sell_do.html
https://www.a2gov.org/departments/city-administrator/Pages/Library-Lot-RFP-Responses.aspx
http://www.mlive.com/news/ann-arbor/index.ssf/2018/04/future_of_ann_arbors_library_l.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/03/an_overview_of_the_17-story_de.html
https://treedowntown.com/2016/06/22/the-library-lot-get-busy-living-or-get-busy-dying/
https://localwiki.org/ann-arbor/Library_Lane
The Gallery
441 S Ashley St - Approved
22 unit condo building just south west of downtown. 21 two bedroom units and 1 three bedroom unit for a total of 45 bedrooms. Demolition of the existing buildings on the site is underway as of February 2019.
Floors: 5
Height: 52 feet
Parking Spaces: 22
Cost: $4M
Total Square Feet: 35000
Residential Units: 19
Bedrooms: 48
http://www.annarborbuilders.com/gallery
https://www.mlive.com/news/ann-arbor/2019/01/demolition-begins-to-make-way-for-5-story-condo-building-in-ann-arbor.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/06/the_gallery_condo_development.html
The Garnet
325 E Summit - Proposed
Small condo building near the train station. Rezoning rejected by city council, but it may be coming back?
Floors: 4
Height: 57 feet
Parking Spaces: 14
Cost: $4.5M
Total Square Feet: 16790
Residential Units: 10
Bedrooms: 26
https://www.mlive.com/news/ann-arbor/2019/09/ann-arbor-rejects-rezoning-for-proposed-condo-development.html
https://www.mlive.com/news/ann-arbor/2019/08/ann-arbor-council-delays-vote-on-proposed-condo-development.html
https://www.mlive.com/news/ann-arbor/2019/05/ann-arbor-condos-get-initial-ok-after-developer-agrees-to-more-bicycle-parking.html
The George
2502 Packard St - Complete
Long delayed mixed use complex with 249 apartments and 24,000 square feet of retail. Consists of mostly 1 and 2 bedroom units, some studios and 3 bedroom units. Formerly known as Packard Square. Move ins are starting as of April or May 2018.
Construction Start: 2015
Construction Finish: 2018
Floors: 4
Height: 49 feet
Parking Spaces: 459
Cost: $93.5M
Total Square Feet: 363356
Residential Units: 249
Bedrooms: 387
Retail Square Feet: 23462
https://www.thegeorgeannarbor.com/
http://www.mlive.com/business/ann-arbor/index.ssf/2018/04/see_inside_luxury_apartments_a.html
http://www.mlive.com/business/ann-arbor/index.ssf/2018/03/luxury_apartments_near_complet.html
http://www.mlive.com/business/ann-arbor/index.ssf/2017/10/bankruptcy_denied_future_uncle.html
http://www.mlive.com/business/ann-arbor/index.ssf/2017/09/935m_packard_square_project_in.html
http://www.mlive.com/business/ann-arbor/index.ssf/2017/03/progress_on_ann_arbors_packard.html
https://localwiki.org/ann-arbor/Packard_Square
The Mark
318 W Liberty - Complete
Small condo building just west of downtown.
Construction Start: Spring 2015
Construction Finish: Summer 2016
Floors: 4
Height: 49 feet
Parking Spaces: 14
Total Square Feet: 11910
Residential Units: 7
Bedrooms: 16
http://www.annarborbuilders.com/blog-topic/mark-condos
http://www.mlive.com/news/ann-arbor/index.ssf/2016/07/latest_condo_development_in_do.html
https://localwiki.org/ann-arbor/The_Mark_Condominiums
The Summit Townhomes
2081 E Ellsworth Rd - Approved
24 townhouses south of I-94. The site plan states that these townhomes will be around 1300 sqft in floor area. This project had been stalled for a while but appears to possibly be coming back to life.
Floors: 3
Height: 30 feet
Residential Units: 24
The Yard on South Main
615 S Main St. - Complete
229 unit student targeted apartment with 6,200 square feet of ground floor retail. Units are mostly studios, 2 bedrooms, and 3 bedrooms. Formerly known as The Residences at 615 S Main. Rents run from $1000 to $1900 a month per bedroom.
Construction Start: Fall 2016
Construction Finish: Summer 2018
Floors: 6
Height: 75 feet
Parking Spaces: 258
Cost: $40M
Total Square Feet: 286079
Residential Units: 229
Bedrooms: 586
Retail Square Feet: 6200
http://www.livetheyard.com/
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/the_yard_ann_arbor_apartments.html
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/treeline.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/take_a_virtual_tour_of_luxury.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/07/main_street_apartment_project.html
https://localwiki.org/ann-arbor/The_Residences_at_615_South_Main
Traverwood Two Addition
2900 Huron Parkway - Under Construction
Addition to connect two office buildings, enclosing part of the parking lot and converting it to a courtyard.
Floors: 1
Total Square Feet: 7500
Trotter Multicultural Center
428 S State St - Complete
State street located replacement for the University of Michigan's existing Trotter Multicultural Center to the east of central campus.
Construction Start: Summer 2017
Construction Finish: Spring 2019
Floors: 3
Cost: $10M
Total Square Feet: 20000
http://umaec.umich.edu/projects/major-projects/trotter-william-monroe-multicultural-center-new-multicultural-center/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/11/university_of_michigan_breaks.html
http://www.mlive.com/news/ann-arbor/index.ssf/2016/12/u-m_unveils_design_plans_for_n.html
University CSE Building Addition
Hayward - Concept
Addition to the Beyster Building on the Unversity's North Campus to serve as additional space for the computer science program and as a new home for the School of Information. Information comes from the FY2019 UM capital outlay master plan. Image from the 2008 North Campus master plan update showing possible building sites.
Cost: $145M
Total Square Feet: 163000
https://expo.mlive.com/news/g66l-2019/07/0927aa4dcb704/moving-schools-new-student-housing-part-of-university-of-michigans-5year-plan.html
https://record.umich.edu/articles/u-m-submits-capital-funding-requests-projects-three-campuses
University Housing Project
- Concept
https://expo.mlive.com/news/g66l-2019/07/0927aa4dcb704/moving-schools-new-student-housing-part-of-university-of-michigans-5year-plan.html
https://www.mlive.com/news/ann-arbor/2019/07/university-of-michigan-eyes-student-housing-as-construction-on-former-fingerle-property-begins.html
University of Michigan Golf Clubhouse
500 E Stadium - Complete
Replacement of the University golf clubhouse.
Construction Start: Winter 2016
Construction Finish: Spring 2017
Cost: $15M
Total Square Feet: 23000
http://umaec.umich.edu/projects/completed-projects/richard-l-postma-family-clubhouse/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/04/new_15m_university_of_michigan.html
Upland Green II
1777 Plymouth - Complete
Apartment building just north of North Campus. Second phase of the Upland Green development.
Construction Start: Fall 2014
Construction Finish: Winter 2016
Floors: 3
Height: 38 feet
Parking Spaces: 42
Total Square Feet: 26216
Residential Units: 34
Bedrooms: 34
http://www.uplandgreen.com/apartments_rear.html
http://www.mlive.com/business/ann-arbor/index.ssf/2015/12/finishing_touches_being_made_o.html
https://localwiki.org/ann-arbor/Upland_Green
Valhalla Glen
Valhalla - Proposed
Proposal to combine several pieces of property, rezone the land, and build a residential project of apartments and townhomes.
Residential Units: 495
Veridian @ County Farm
2270 Platt Road - Concept
125 to 150 units at various price points, including a large affordable component, on the county owned property off Platt Road near Arborland. Final purchase agreement being worked out between the county and developer.
Residential Units: 125
http://www.happyhome.how/veridianatcountyfarm/
https://www.mlive.com/news/ann-arbor/index.ssf/2018/09/veridian_at_county_farm.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/08/solar-powered_mixed-income_cot.html
https://localwiki.org/ann-arbor/Veridian_at_County_Farm
Vic Village East
1209 S University - Stalled
Student targeted apartment tower on South University. 166 beds across 34 apartments. 1760 sqft of retail on the ground floor. This proposal looks to have been withdrawn in early 2018. Two of the three buildings on the site were demoslished in late 2017 / early 2018. As of early 2018 the site is being used as storage for the Vic Village North project down the street. Formerly known as the Collegian East. A March 2019 MLive article noted that the new Vic Village South project had been bumped ahead of the east project.
Floors: 13
Height: 149 feet
Parking Spaces: 12
Total Square Feet: 74760
Residential Units: 34
Bedrooms: 166
Retail Square Feet: 1760
http://hughes-properties.net/property/colligian-east/
http://www.mlive.com/news/ann-arbor/index.ssf/2016/09/13-story_high-rise_planned_for.html
Vic Village North
1107 S University - Complete
Student targeted apartment building on South University with 57 apartments totaling 261 bedrooms. Consists mostly of three to six bedroom units. 4 retail spaces at the base. Formerly known as the Collegian North.
Construction Start: Fall 2017
Construction Finish: Summer 2019
Floors: 12
Height: 150 feet
Total Square Feet: 131722
Residential Units: 57
Bedrooms: 261
Retail Square Feet: 5385
http://thevicvillage.com/
https://thevicvillage.com/
http://www.mlive.com/news/ann-arbor/index.ssf/2017/10/demolition_begins_on_south_u_t.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/05/new_high-rise_development_to_t.html
https://www.michigandaily.com/section/ann-arbor/construction-begins-south-u-building-students-and-city-have-differing-opinions
https://localwiki.org/ann-arbor/Collegian_North
Vic Village South
1100 S University - Proposed
A student focused apartment tower on the south side of S University.
Construction Start: 2020
Floors: 13
Height: 150 feet
Parking Spaces: 74
Total Square Feet: 185149
https://www.mlive.com/news/ann-arbor/2019/03/plans-unveiled-for-13-story-vic-village-south-high-rise-in-ann-arbor.html
Wall Street West Parking Structure
Wall St - Under Construction
A second parking structure on Wall Street for University of Michigan Medicine. 1080 spots replacing a 130 space lot.
Construction Start: Summer 2019
Construction Finish: Fall 2020
Floors: 7
Parking Spaces: 1080
Cost: $39.5M
http://umaec.umich.edu/projects/major-projects/wall-street-west-parking-structure/project-details/
https://www.mlive.com/news/ann-arbor/2018/12/university-of-michigan-unveils-plans-for-parking-garage-near-medical-campus.html
http://www.mlive.com/news/ann-arbor/index.ssf/2017/12/university_of_michigan_proposi_1.html
White State Henry Apartments
1525 S State - Approved
Replace existing 28 unit affordable housing building with a new 32 unit one with an onsite community center. To consist of 23 one bedroom units and 9 two bedroom units for a total of 41 bedrooms. To be affordable for tenants up to 60% of area median income. Demolition of the existing buildings starting in winter 2019.
Construction Start: 2019
Construction Finish: Winter 2020
Floors: 3
Height: 30 feet
Parking Spaces: 14
Cost: $7M
Total Square Feet: 35592
Residential Units: 28
Bedrooms: 41
https://www.a2gov.org/departments/Housing/programs/Pages/White-State-Henry.aspx
https://www.mlive.com/news/ann-arbor/index.ssf/2018/06/henry_street_platt_road_afford.html
http://www.mlive.com/news/ann-arbor/index.ssf/2015/09/affordable_housing_on_state_st.html
https://localwiki.org/ann-arbor/White_State_Henry_Apartments
Zoller Building
3900 Research Park Drive - Complete
Single floor headquarters for Zoller, a manufacturing supplier, on the far south side of Ann Arbor. Mix of commercial and light industrial uses.
Construction Start: Fall 2016
Construction Finish: Winter 2018
Floors: 1
Parking Spaces: 91
Cost: $5M
Total Square Feet: 44525
Office Square Feet: 44525
http://www.mlive.com/news/ann-arbor/index.ssf/2016/05/ann_arbor_approves_5m_headquar.html